HFCAS OpenIR  > 中科院等离子体物理研究所
ITER vacuum vessel structural analysis completion during manufacturing phase
Martinez, J. -M.1; Alekseev, A.1; Sborchia, C.1; Choi, C. H.1; Utin, Y.1; Jun, C. H.1; Terasawa, A.1; Popova, E.1; Xiang, B.1; Sannazaro, G.1; Lee, A.1; Martin, A.1; Teissier, P.1; Sabourin, F.1; Caixas, J.2; Fernandez, E.2; Zarzalejos, J. M.2; Kim, H. -S.3; Kim, Y. G.3; Privalova, E.4; Du, S.5; Wang, S.5; Albin, V.6; Gaucher, T.6; Borrelly, S.7; Cambazar, M.8; Sfarni, S.8
2016-11-01
发表期刊FUSION ENGINEERING AND DESIGN
摘要Some years ago, analyses were performed by ITER Organization Central Team (IO-CT) to verify the structural integrity of the ITER vacuum vessel baseline design fixed in 2010 and classified as a Protection Important Component (PIC). The manufacturing phase leads the ITER Organization domestic agencies (IO-DA) and their contracted manufacturers to propose detailed design improvements to optimize the manufacturing or inspection process. These design and quality inspection changes can affect the structural margins with regards to the Codes&Standards and thus oblige to evaluate one more time the modified areas. This paper proposes an overview of the additional analyses already performed to guarantee the structural integrity of the manufacturing designs. In this way, CT and DAs have been strongly involved to keep the considerable margins obtained previously which were used to fix reasonable compensatory measures for the lack of In Service Inspections of a Nuclear Pressure Equipment (NPE). (C) 2016 Elsevier B.V. All rights reserved.
文章类型Article
关键词Iter Vacuum Vessel Nuclear Pressure Equipment Structural Integrity Analysis Manufacturing Design Rcc-mr
WOS标题词Science & Technology ; Technology
DOI10.1016/j.fusengdes.2016.02.017
收录类别SCI ; ISTP
语种英语
WOS研究方向Nuclear Science & Technology
WOS类目Nuclear Science & Technology
WOS记录号WOS:000382421900120
引用统计
被引频次:8[WOS]   [WOS记录]     [WOS相关记录]
文献类型期刊论文
条目标识符http://ir.hfcas.ac.cn:8080/handle/334002/30826
专题中科院等离子体物理研究所
作者单位1.ITER Org, Route Vinon Verdon,CS 90046, F-13067 St Paul Les Durance, France
2.F4E, C Josep Pla 2,Torres Diagonal Litoral,Edificio B3, E-08019 Barcelona, Spain
3.ITER Korea, Natl Fus Res Inst, Daejeon, South Korea
4.NTC Sintez, Efremov Inst, St Petersburg 189631, Russia
5.Chinese Acad Sci ASIPP, Inst Plasma Phys, Hefei, Peoples R China
6.Sogeti High Tech, RE2, 180 Rue Rene Descartes, F-13857 Aix En Provence, France
7.SOM Calcul Grp ORTEC, 121 Ancien Chemin Cassis, F-13009 Marseille, France
8.ZAC St Martin, Assyst EOS, 23 Rue Benjamin Franklin, F-84120 Pertuis, France
推荐引用方式
GB/T 7714
Martinez, J. -M.,Alekseev, A.,Sborchia, C.,et al. ITER vacuum vessel structural analysis completion during manufacturing phase[J]. FUSION ENGINEERING AND DESIGN,2016,109(无):688-692.
APA Martinez, J. -M..,Alekseev, A..,Sborchia, C..,Choi, C. H..,Utin, Y..,...&Sfarni, S..(2016).ITER vacuum vessel structural analysis completion during manufacturing phase.FUSION ENGINEERING AND DESIGN,109(无),688-692.
MLA Martinez, J. -M.,et al."ITER vacuum vessel structural analysis completion during manufacturing phase".FUSION ENGINEERING AND DESIGN 109.无(2016):688-692.
条目包含的文件 下载所有文件
文件名称/大小 文献类型 版本类型 开放类型 使用许可
ITER vacuum vessel s(2789KB)期刊论文作者接受稿开放获取CC BY-NC-SA浏览 下载
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Martinez, J. -M.]的文章
[Alekseev, A.]的文章
[Sborchia, C.]的文章
百度学术
百度学术中相似的文章
[Martinez, J. -M.]的文章
[Alekseev, A.]的文章
[Sborchia, C.]的文章
必应学术
必应学术中相似的文章
[Martinez, J. -M.]的文章
[Alekseev, A.]的文章
[Sborchia, C.]的文章
相关权益政策
暂无数据
收藏/分享
文件名: ITER vacuum vessel structural analysis completion during manufacturing phase.pdf
格式: Adobe PDF
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。